Turnkey EPC Process
Eksper Enerji EPC steps from survey to grid connection.
Site survey → system design → permitting → installation → inspection → grid connection → operation and maintenance.
3D shading analysis, regional radiation, structural calculations and EDAŞ yield modeling are part of the design phase.
Managing engineering, procurement and installation under one roof reduces communication breakdowns and makes quality control easier.
At the end of the process, the system is followed through monitoring. Our maintenance and repair guide and FAQ page answer common questions in the operation period.
Keep going
Related guides
- Solar Energy Installation TimeSolar PV installation generally takes 3–10 days. The site survey and permits affect the timeline.
- Solar Panel Cost and Solar PV Cost AnalysisSolar panel cost varies by capacity, area and equipment. Get a clear quote with a free site survey.
- Solar Energy Systems for Housing Development ProjectsRooftop solar PV, storage and net metering for housing and new development projects. Sakarya, Ankara, İzmir and regional surveys.
- Solar PV Permitting ProcessesEksper Enerji manages local authority and EDAŞ permits on your behalf.