Guide
Solar PV Permitting Processes
Eksper Enerji manages local authority and EDAŞ permits on your behalf.
Permits may be required from local authorities and energy distribution companies. The required documents vary by project type (on-grid, hybrid, industrial).
Eksper Enerji manages all bureaucratic processes on your behalf; we provide unlicensed generation and grid connection consulting.
A solar PV panel board and connection preparation compliant with EDAŞ regulations are critical for the approval process to proceed smoothly. The next steps are summarized in our grid connection guide.
In residential and small commercial projects, the document set may be more limited; in industrial rooftop solar PV, the call letter and technical drawings add extra time. The schedule is clarified after the survey.
Keep going
Related guides
- Solar Energy Installation TimeSolar PV installation generally takes 3–10 days. The site survey and permits affect the timeline.
- Solar Panel Cost and Solar PV Cost AnalysisSolar panel cost varies by capacity, area and equipment. Get a clear quote with a free site survey.
- Solar Energy Systems for Housing Development ProjectsRooftop solar PV, storage and net metering for housing and new development projects. Sakarya, Ankara, İzmir and regional surveys.
- Solar Energy Grant with IPARDUp to 50–70% solar PV grant opportunity under IPARD for agricultural facilities.