Solar PV Grid Connection
Feeding surplus energy to the grid and an EDAŞ-compliant connection process.
By connecting your system to the local electricity grid, we enable surplus energy to be fed in and support to be drawn from the grid.
We provide consulting on unlicensed generation processes with a panel board and connection compliant with EDAŞ regulations. In on-grid and hybrid systems, the net metering / sales model is clarified during the survey.
After connection, production is tracked through monitoring; the goal is to preserve performance within the scope of operation and maintenance.
Our net metering and unlicensed generation guide summarizes the legal framework; the final model is determined according to the subscription and current regulations.
Keep going
Related guides
- Solar Energy Installation TimeSolar PV installation generally takes 3–10 days. The site survey and permits affect the timeline.
- Solar Panel Cost and Solar PV Cost AnalysisSolar panel cost varies by capacity, area and equipment. Get a clear quote with a free site survey.
- Solar Energy Systems for Housing Development ProjectsRooftop solar PV, storage and net metering for housing and new development projects. Sakarya, Ankara, İzmir and regional surveys.
- Solar PV Permitting ProcessesEksper Enerji manages local authority and EDAŞ permits on your behalf.